Getting Your Property Ready for ADU Construction
You've gotten your permits approved. Construction is about to start. But is your property ready? Proper preparation prevents delays, reduces costs, and keeps your neighbors happy during the build.
Here's everything you need to do before the crew arrives.
1. Clear the Build Area
For Garage Conversions
- Empty the garage completely -- everything must go
- Arrange temporary storage (pods, storage units, or covered area on your property)
- Remove any shelving, workbenches, or wall-mounted items
- Clear the area immediately around the garage exterior (3-4 feet minimum)
For New Construction ADUs
- Remove patio furniture, play equipment, and landscaping from the build zone
- Relocate any outdoor storage sheds that conflict with the ADU footprint
- Trim or remove trees within 5 feet of the construction area (check if permits are needed for tree removal)
- Remove fencing sections that block construction access
For Junior ADUs
- Clear the room or area being converted
- Move furniture and belongings out of the conversion zone
- Clear hallways and paths that construction crews will use
2. Address Utility Infrastructure
Before construction starts, have your builder verify:
- Sewer lateral condition: A video inspection of your sewer line can reveal problems that would delay construction
- Water meter capacity: Ensure your water service can support an additional unit
- Electrical panel capacity: An older 100-amp panel may need upgrading to 200-amp
- Gas meter: Verify the gas meter can support additional appliances
Your builder should handle these assessments, but knowing the potential issues helps you prepare financially. Utility upgrades can add to your total project cost.
3. Secure Construction Access
The construction crew needs access to your property with:
- Vehicle access: A clear path for delivery trucks, concrete trucks, and equipment
- Material staging area: A flat area to store lumber, drywall, and materials
- Power supply: Temporary power connection for tools (your builder typically arranges this)
- Water access: A working outdoor spigot for mixing materials and cleanup
If access is through a narrow side yard, discuss logistics with your builder early. Difficult access can affect cost and timeline.
4. Protect Your Existing Property
Construction generates dust, vibration, and foot traffic. Protect your property:
- Landscaping: Cover plants near the build zone or temporarily relocate potted plants
- Driveway: Discuss protection for your driveway from heavy equipment
- Fencing: Expect temporary fencing or barriers around the construction area
- Pool/spa: Cover your pool if it's near the build zone
- Pets: Plan for pet safety during construction hours -- open gates, loud noises, and unfamiliar workers can be stressful for animals
5. Communicate with Neighbors
Good neighbor relations make construction go smoother:
- Notify neighbors about the project, expected timeline, and working hours
- Share your builder's contact information so neighbors can reach someone directly with concerns
- Address parking: Construction vehicles may temporarily affect street parking
- Set expectations: Standard construction hours in most cities are 7:00 AM to 6:00 PM, Monday through Saturday
Cities like Pasadena and Beverly Hills may have stricter noise ordinances -- your builder should know the local rules.
6. Plan for Living During Construction
Garage Conversions
- You'll lose your garage for parking -- plan alternative parking
- Construction noise is mostly outside your living space
- Disruption is relatively minor compared to other ADU types
New Construction ADUs
- Backyard access will be limited during construction
- Foundation and framing phases are the noisiest
- Plan to keep kids and pets out of the backyard during work hours
Junior ADUs
- Part of your home will be a construction zone
- Discuss dust barriers and containment with your builder
- You may want to temporarily relocate if the conversion is extensive
7. Review Your Insurance
Contact your homeowner's insurance provider:
- Notify them about the construction project
- Verify coverage for construction-related incidents
- Ask about builder's risk insurance (your contractor should carry this)
- Plan to update your policy once the ADU is complete (adding the ADU increases your insurable property)
8. Set Up Your Financial Plan
Have your financing arranged before construction starts:
- Construction draws: Understand your builder's payment schedule
- Contingency fund: Set aside 10-15% for unexpected expenses
- Timeline buffer: Have living expense coverage if the project takes longer than expected
Pre-Construction Checklist
Use this checklist before your first day of construction:
- [ ] Build area completely cleared
- [ ] Temporary storage arranged
- [ ] Utility inspections completed
- [ ] Construction access path confirmed
- [ ] Landscaping and property protection in place
- [ ] Neighbors notified
- [ ] Alternative parking arranged (if garage conversion)
- [ ] Pet safety plan in place
- [ ] Insurance company notified
- [ ] Financing fully arranged
- [ ] Emergency contacts exchanged with your builder
What Your Builder Should Handle
A quality ADU builder (like Vision ADU) handles most pre-construction logistics:
- Arranging portable toilets
- Scheduling utility disconnections and reconnections
- Coordinating material deliveries
- Setting up construction fencing and signage
- Pulling all required permits
- Scheduling inspections
If your builder isn't handling these basics, you may want to reconsider your choice. Read our guide on how to choose an ADU builder.
> Ready to start your ADU project? Book a free consultation with Vision ADU. We handle everything from permits to construction to final inspection -- so you can focus on planning your new rental income.
---
Proper preparation makes for a smoother build. Contact Vision ADU and we'll walk you through every step of the process, including what to do before construction day one.
Related Vision ADU Resources
- How Appraisers Value ADUs: What Your Property Is Really Worth
- How Jennifer Built Her Dream ADU After 4 Years of Waiting
- California Made It Legal to Sell Your ADU Separately — Here's Everything You Need to Know About AB 1033
- How Much Will an ADU Increase Your Property Value? Use Our Free Calculator to Find Out
- ADU Contractor in Glendale
- ADU Contractor in Riverside
- Los Angeles County ADU Builder
- Orange County ADU Builder
- Inland Empire ADU Builder
- 2026 ADU Cost Calculator
- All Vision ADU Service Areas