Garage Conversion vs. New Construction ADU

Which ADU type is right for your property? Compare costs, timelines, rental income, and ROI to make the right decision.

Home/Compare/Garage Conversion vs New Construction

Side-by-Side Comparison

FeatureGarage ConversionNew Construction ADU
Construction EstimateProperty-specific written estimateProperty-specific written estimate
Timeline4–6 months6–12 months
Max Size400–600 sq ft (limited by garage)Up to 1,200 sq ft
Rental Income$1,500–$2,200/mo$2,000–$3,500/mo
Property Value Increase$100,000–$180,000$150,000–$350,000
Foundation WorkMinimal (existing slab)New foundation required
Design FlexibilityLimited by existing structureFull creative freedom
Backyard ImpactNoneReduces backyard space

Which Is Right for You?

Choose a garage conversion if: you want to reuse an existing detached garage, minimize new structural work, preserve backyard space, or start generating income sooner.

Choose new construction if: you want the largest possible unit, maximum rental income, full design control, or you don't have an existing garage to convert.

Do both: California law allows one converted ADU plus one new construction ADU on the same property — many homeowners convert first, then build later.

Not sure which option fits your property?

Our team will evaluate your property and recommend the best approach — free.

Book Free Consultation (866) 668-4264